How long does a mall unit fit-out take in Vizag?
Four to eight weeks of site work for a typical unit, but the honest answer includes the approval cycle before it. Mall drawing approval and the comment cycle commonly add two to four weeks, and night-only working roughly halves the productive hours in a day. We start the approval submission the day the unit is confirmed, because that is where the recoverable time is.
What is a fit-out manual and why does it matter so much?
It is the mall's rulebook for tenant works: shopfront line and signage zone, permitted materials, ceiling void and sprinkler coordination, flooring transitions, barricade specification, working hours, and the service route for materials. It governs the design, so it has to be read before drawings are produced. A design that ignores it will be rejected at approval, and that rejection costs weeks of a fit-out window you are paying rent against.
Do you handle the mall approvals and drawings?
Yes. We prepare the approval drawing set to the mall's format, submit it, and manage the comment cycle through to sign-off, along with contractor gate passes and worker documentation. The mall's approval decision is theirs, but the completeness and quality of the submission is what determines how many cycles it takes.
Why do malls restrict work to night hours?
Because tenant fit-out work cannot disturb trading tenants or shoppers. In practice this means a booked service-lift slot, materials moved after closing, and a productive window of roughly six to eight hours instead of a full day. It does not make a fit-out impossible — it makes the programme longer, and it has to be planned that way from the start rather than absorbed as a surprise.
How is a kiosk or RMU different from a mall unit?
It is mostly a factory-build problem. A kiosk is fabricated off site, delivered, and assembled in a very short overnight window in a trading mall, so dimensional precision matters far more — there is no opportunity to trim something to fit on the concourse. Power tie-in point, footprint dimensions and the mall's height restriction have to be confirmed before fabrication starts, not at delivery.
What does a mall or kiosk fit-out cost in Vizag?
Kiosks and RMUs are quoted as a fabricated unit plus installation. Mall units are priced from a line-item BOQ after the fit-out manual and unit drawings are reviewed, because the manual itself drives cost — mandated materials, ceiling access requirements and signage specifications are not optional. We separate the approval and compliance scope from the build scope so you can see what the mall's own requirements are adding.