Have you delivered a hotel fit-out in Chennai?
Not yet. In Chennai we have delivered offices (KG360, Vridhi Siruseri), homes (Ozone, OMR residence, Sri Vaikuntam) and an F&B fit-out (Dessert Addictions). We would rather tell you that plainly than present a render as a reference. If a delivered hotel in this city is a requirement for your shortlist, we are not the right fit for that criterion, and the disciplines that transfer — prototype-first repeatability, phasing around live operations, public-area coordination — are set out on this page for you to judge.
Can you work while the property stays open?
Yes, floor by floor or block by block with hoarding, separate worker access and agreed noise windows. Expect roughly 20 to 40% longer than the same scope in a vacant property, because hours are restricted and set-up and clean-down happen daily rather than once. The maximum rooms out of inventory is agreed with you before mobilising — that number, not our labour capacity, sets the programme.
Why build a prototype room first?
Because a guest-room fit-out is a repeated product and every error repeats with it. The prototype locks dimensions, finishes, socket and switch positions, hardware, and the housekeeping details that only surface when someone tries to clean the room. Finding a problem in room one costs a week. Finding the same problem in room thirty costs the programme and the budget.
How is guest-room joinery specified differently from residential?
For abuse and for cleaning rather than appearance. Suitcase impact on skirtings and bed bases, wet towels on vanity tops, and daily chemical cleaning are loads no home imposes. That means moisture-resistant substrates, fully sealed machine-banded edges with no open joints, and surfaces chosen so a damaged panel is repaired in place rather than requiring the room to be stripped.
Does a sea-facing Chennai property need different specification?
Yes, and it should be surveyed rather than assumed. Sea-facing rooms, balconies and outdoor-adjacent public areas need BWP IS:710 substrate and stainless hardware, moving to SS 316 in genuinely severe exposure; inland-facing rooms in the same building often do not. Blanket-applying the heaviest specification wastes money; blanket-applying the lightest means rust-bleed in the sea-facing bathrooms within a year, and a room out of service to fix it.
Can you execute to an operator's brand standard?
Yes. We work to a designer's intent or an operator's brand manual, producing shop drawings, material submittals and a prototype for approval against it. Where a brand standard conflicts with coastal durability — a plated fitting specified for a sea-facing bathroom — we raise it in writing with an alternative rather than install a known failure.