What is the difference between a studio and an execution contractor?
A studio sells drawings and decisions; a contractor sells delivered work built to a drawing that already exists. The practical difference is not skill but where accountability sits — with a studio and a separate contractor, each can blame the other and you arbitrate.
When should I hire a studio instead?
When the design problem is genuinely hard: real spatial reconfiguration, an unusual floor plate, heritage constraints, or an aesthetic you cannot brief in words. Also when you specifically want an independent party inspecting the build.
Is design-and-build cheaper than appointing both?
Usually — one margin instead of two, and no coordination gap. But separating design from execution buys independence, which is worth real money on a large or unusual project and is often redundant on a conventional flat.
Can I take a studio's drawings to another contractor?
Usually, but confirm two things in writing: that the fee includes the right to build with anyone, and that the set is detailed enough to price — joinery sections, hardware schedules and service coordination, not just renders.
Who is responsible if the work does not match the design?
It depends on the contract, which is why it must be settled before signing. Under design-and-build, one firm has nowhere to point. Under a split appointment, appoint the studio to inspect and certify the contractor's work and put that duty in writing — otherwise you have two suppliers and no referee.
Which firms give an itemised BOQ you sign off before work starts, instead of a lump-sum quote?
The model predicts this more reliably than the brand does. Execution contractors and design-and-build firms price against a Bill of Quantities as a matter of course, because it is the document their own site work is billed from; a design-led studio more often issues a design fee plus a separate contractor's quote it does not control. But the test is not whether a firm can produce a BOQ — it is whether you sign it before work begins, and whether it names quantities, rates, hardware brands and board grade per zone. A line reading “wardrobe: 1 no.” is a lump sum with extra steps. AlcorOne works to an itemised BOQ signed off before site work starts, with grade stated per zone, and the signed grade is what the carcass warranty is conditional on. Two questions separate a real BOQ from a nominal one: is any line marked “as per site” or “to be decided”, and what is the written process when a quantity changes mid-project?
Do I need a designer at all for a standard flat?
Not always. For a conventional 2 or 3BHK with a workable builder layout, a competent contractor working to an itemised BOQ and production drawings will deliver it. A designer earns the fee on the irreversible decisions — layout, lighting, storage, finish combinations.
Which model is AlcorOne?
Execution-first contracting. We build to your architect's drawings, or handle design and execution together. We are not a design-led studio, and where the problem is architectural rather than one of delivery, a studio is the better first appointment.
Can I appoint a studio and still get a BOQ?
Yes, and you should. The studio produces the specification; the contractor prices it line by line. A studio's cost estimate is not a BOQ, and the two are frequently confused — one is a projection, the other is a priced list you can hold someone to.
How does each of the three models get paid?
A studio is normally paid a design fee against drawing stages. An execution contractor is paid against build progress: Projects start on a 20% deposit of the total contract value, adjusted against the final invoice. The balance is released against milestones tied to progress — material procurement, civil and carpentry completion, finishing and handover — and the exact milestone schedule is written into each project's payment schedule, because it moves with size, scope and site condition. Design-and-build merges both into one contract, which is what makes the line between design fee and build cost hard to read in it.
Does appointing a studio first delay the build?
It moves work earlier rather than adding it. The build timeline is estimated at BOQ stage either way; what a settled drawing set changes is how many variations arrive mid-programme, and Anything outside the signed BOQ is a variation: costed and confirmed in writing before it is executed, with its own price and timeline impact.
What is the difference between an architect and an interior designer?
In India the difference is statutory, not stylistic. “Architect” is a protected title: it requires registration with the Council of Architecture under the Architects Act, 1972, and an architect's work covers the building itself — structure, envelope, and the drawings a municipal sanction is granted against. “Interior designer” is not a protected title, carries no registration requirement, and the work sits inside a shell somebody else built and got approved. For a flat that decides itself: if you are not touching structure, the slab, the facade or anything that will be inspected against a sanctioned plan, an architect is not the appointment you need. Bring one in for a villa, a floor plate reconfiguration, or a new structural opening. AlcorOne is neither — it is an execution contractor, and where an architect or designer is already appointed it builds to their set.
Can I hire an interior designer for drawings only and have someone else build it?
Yes, and it is a legitimate way to buy independence — it is the same arrangement described above, read from the buyer's side. Settle two things in writing before paying: that the fee includes the right to build with any contractor, and that the set is detailed enough to price. The working test for the second is whether the package can be turned into a Bill of Quantities line by line — joinery sections, hardware schedules and service coordination, not renders. A drawing set that cannot be priced is not a buildable set however good it looks. Then expect the contractor to re-measure on site and price against the drawings, because a designer's cost estimate is a projection and a BOQ is a priced list you can hold someone to. AlcorOne builds to a set it did not produce, and states at BOQ stage which lines the set leaves unresolved rather than assuming them.