# Restaurants are won behind the pass.

Diners judge the seating. Whether the business works depends on exhaust that actually pulls, a grease route that does not block, floors that survive a wet mop three times a day, and an opening date that holds. AlcorOne builds the front-of-house around a back-of-house that has been engineered first.

## What a restaurant fit-out *has to get right.*

The order of work matters more here than in any other fit-out type, because services are buried and a licensing inspection can stop you at the last step.

### Kitchen services first

Exhaust routing, make-up air, gas line positions, drainage falls and grease trap access are set before a single partition goes up. Every one of these is expensive to move once the ceiling closes.

### Exhaust that actually pulls

An undersized hood or an over-long duct run leaves smoke in the dining room and heat in the kitchen. Hood dimensions, duct sizing and discharge position are calculated against the cooking line, not fitted to whatever ceiling void was left over.

### Surfaces that pass inspection

Food-contact and splash zones need non-porous, cleanable surfaces with coved junctions and no open joints where residue collects. This is a specification decision at BOQ stage, not something a finishing contractor can retrofit.

### Wet-area detailing

Kitchen and washing areas get correct floor falls to drain, waterproofing carried up the walls, and non-slip flooring. Standing water in a commercial kitchen is a safety, hygiene and structural problem at once.

### Front of house that survives volume

Seating, counters and service stations take daily abuse. Substrates are moisture-resistant, edges are machine-banded and sealed, and high-contact surfaces are chosen to be repairable rather than replaceable.

### Sequencing to an opening date

We work backwards from your opening, with licensing and inspection dependencies marked on the programme. Trades that block a subsequent inspection are scheduled first, not when convenient.

## Completed F&B *work in Vizag.*

### Seating and banquettes

Upholstery · Repairable surfaces

### Counters and service stations

Moisture-resistant · Sealed edges

### Storefront and signage

Facade · Lighting · Glazing

## The coastal factor *in a Vizag kitchen.*

A commercial kitchen is already a hostile environment. In Vizag the outside air adds to it rather than relieving it.

### Corrosion on exposed metal

Salt air plus kitchen humidity attacks ducting, brackets and fasteners fast. Exposed metalwork is specified in stainless or properly coated systems — patching corroded ducting after opening means shutting the kitchen.

### Humidity and joinery movement

Front-of-house joinery in a coastal city needs moisture-resistant substrate even where it never gets wet. Ambient humidity alone will swell an unsuitable board over a season.

### Make-up air, not just extraction

Extraction without a planned air path pulls conditioned air out and creates negative pressure that fights the door. In humid coastal conditions that also drags moisture-laden air through every gap in the envelope.

## Vizag F&B *corridors we work in.*

Beach RoadDwaraka NagarMVP ColonySiripuramRushikondaMadhurawadaAsilmettaJagadamba

## Sources & *references.*

Standards, regulatory registries, and manufacturer references that back the material grades, pricing framework, and compliance points in this guide:

- [Andhra Pradesh RERA — project registry](https://rera.ap.gov.in/)

## Questions we *hear most.*

### How long does a restaurant fit-out take in Vizag?

Eight to fourteen weeks for a typical mid-size restaurant, depending on how much of the kitchen services scope is new. A shell unit needing fresh exhaust routing, gas lines and drainage falls sits at the longer end. The commonest cause of overrun is not construction speed — it is a services decision changed after the ceiling has closed.

### Do you handle the commercial kitchen equipment as well as the interiors?

We coordinate to it rather than supply it. Your kitchen equipment vendor specifies the cooking line; we build the services, ducting routes, drainage and surfaces around it. This split works better when the equipment schedule is fixed early, because hood sizing and gas positions depend entirely on it. A kitchen layout changed late is the most expensive change available on the project.

### Will the fit-out be ready for FSSAI and licensing inspection?

We build to the surface, drainage and ventilation requirements those inspections look at — non-porous cleanable finishes in food zones, coved junctions, correct floor falls to drain, waterproofing, and functioning extraction. Obtaining the licence itself is your application to make, and we provide the drawings and specifications it requires. We do not represent ourselves as licensing agents.

### Why does exhaust design matter so much?

Because getting it wrong is visible from the first service and expensive to correct. An undersized hood or an over-long duct run leaves smoke drifting into the dining room and makes the kitchen unworkable in Vizag's heat. Extraction also needs a planned make-up air path; without one the kitchen runs at negative pressure, which fights the entrance door and pulls humid coastal air through every gap in the envelope.

### Can you work overnight so an existing restaurant stays open?

For a partial refresh, yes — front-of-house joinery and finishes can often be phased into closed hours. Anything touching kitchen services, drainage or the ceiling void realistically needs a closure window. We will tell you honestly which parts of a scope can be phased and which cannot, rather than promising continuous trading and then requesting a shutdown mid-project.

### What does a restaurant fit-out cost in Vizag?

It varies too widely with services scope to publish a meaningful rate. A cafe in a shell with existing services is a different order of cost from a full-kitchen restaurant needing new exhaust, gas and drainage. We price from a line-item BOQ after a site survey and your equipment schedule, separating kitchen services, front-of-house joinery and finishes so you can see what each decision costs.

---